| In Quotations | Part feasibility study is done and an Inquiry Register and Order 
              History Card is maintained. | 
           
            | In the process 
 | Process flow diagram & process FMEA is established along with 
              the control plan. APQP status report maintained.
 PPAP activity completed
 X & R bar chart for process established.
 | 
           
            | For the raw materials 
 | Quality 
              plans for Raw material, Sampling Plans, etc. are followed in accordance 
              with Inspection norms & standards. | 
           
            | For 
              sub-contractors | Approval list, Evaluation and Regular Audit has become an essential 
              norm. | 
           
            | For 
              Inspection | Customer 
              standards and drawings are updated with modification. Old drawings & Modified drawings are disposal off with.
 Quality plan for raw material, Heat treatment and surface coating 
              is established.
 Quality plan process cycle and procedure is established.
 Procedure and control are displayed in the regional language.
 First piece, In-process, & Final Inspection are carried out.
 Metallurgical test, Hydrogen Embrittlement test & Salt
 Spray test is made mandatory.
 Gauges, Instruments & machines are calibrated.
 SPC is followed.
 The gauge R & R study is done.
 Non-confirmative generated products are reported and avoided.
 | 
           
            | In 
              daily manufactured products. | All 
              formats, labels and charts, are identified and revalidated
 Recording, Verifying, Accessing and Auditing Procedures are
 followed.
 Raw material and finished goods records are maintained.
 Preventive maintenance is carried out
 | 
           
            | For 
              Audit | Evaluation 
              of Quality Audit is done regularly. Audit check at the plant and jobber end is carried out.
 Raw material, Production, Tools and Dispatch Audit are carried out.
 | 
           
            | For 
              training 
 | Training 
              norms are established. Training are being carried out at all levels
 Deputation on External training.
 | 
           
            |  |